

Owner
Miami-Dade Aviation Department

Location
Miami International Airport

Contract
AV 10111099 – W.O #3

Total Value
$ 362,040
The work consisted of the replacement of two existing security gates including restroom and existing electrical and concrete foundation. The removal of the existing gate included concrete demolition including electrical, plumbing, and existing foundation four feet deep into the ground. We poured new concrete foundation including steel bollards.
The electrical work consisted of replacing all power and low voltage systems with new conduits and wiring to feed their new security systems.