MIA Midfield Tunnel Security Gate Replacement

Aviation

Owner

Text

Location

Text

Contract

Text

Total Value

Text
The work consisted of the replacement of three existing security gates including restroom and existing electrical and concrete foundation. The Midfield Tunnel Gate remained in operation during the entire construction period. We had to phase the project so we could keep two lanes always open including a fully functioning security system to scan personnel badges and vehicles decals.
The removal of the existing gate included concrete demolition including electrical, plumbing, and existing foundation four feet deep into the ground. We poured new concrete foundation including steel bollards. The electrical work consisted of to replace all power and low voltage systems with new conduits and wiring to feed their new security systems. We had to connect all plumbing connections and a/c as well.